Water Clarifier Roadside
Sewage Waste is transported to the Clarifier and processed to create safe drinking water.
Game Information:
Initial Cost: $4,200
Water Pumping Capacity: 96,000 m3
Sewage Draining Capacity: 32,000 m3
Upkeep Cost: $192
Model Information:
No. of Tris: 1,816
Texture Res: 1024 x 1024
No. of LOD Tris: 255
Texture Res: 256 x 256
Note: This version is not modular, meaning it will be placed next to a road.