Biogas Plant – Main
The main building for the biogas plant containing the generator. Burns the methane accumulated from waste into electricity. Although this building is what actually produces all the energy I made the digester higher so you need to collect garbage for it to work better so make sure you grab that to complete the plant. Lights on subs didn’t work so I had to separate.
Outputs 8mw by default
Main – 1344 tris / 1024×1024
LOD – 121 tris / 128×128