District Recycling Center
Double the capacity of the Rural Recycling Center, with similar pollution levels, but with increased construction and operating costs.
- Triangles/LOD Triangles – 3,804 / 586
- Category – Garbage (Recycling)
- Size – 6×6
- Electrical Use – 80 KW
- Construction Cost – $16,000
- Fire Hazard – 2
- Fire Tolerance – 20
- Garbage Accumulation – 0
- Maintenance Cost – $1,030/week
- Maintenance Cost – $32/Truck/week
- Noise Accumulation – 10
- Noise Radius – 3 tiles
- Pollution Accumulation – 10
- Pollution Radius – 3 tiles
- Sewage Accumulation – 80 m^3/week
- Water Consumption – 96 m^3/week
- Workers U/E/W/H – 5/3/2/1
- Animal Count – 1
- Collection Radius – 50 tiles
- Power Output – 0 MW
- Garbage Capacity – 100,000 units
- Processing Rate – 64,000 units/week
- Garbage Trucks – 5 trucks
Many of the props used with this asset are from the default library of props. However, I am also using props from the Common Props and Trees Collection and it is recommended that you subscribe to all the props in this collection. If you don’t subscribe to this collection, it will still work, but there will be a few props/trees missing.
Check out the More Better Buildings Collection collection for more assets such as this.