DreamCross Ramp2
DreamCross Ramp2 by ferretrun
The Ramp2 is an expasion of the “DreamCross Workbench”
heavy traffic flow control
Cost 4360
Upkeep 49
It allows to make a connection to the “DreamCross Workbench” in a more elegant and less cramped way than “DreamCross The Ramp” but at the cost of higher areal space requirement.
Directly snap it to any end of the “DreamCross Workbench” to directly lead high traffic volumes to and from the the 2nd level street.