Material Recovery Facility
The MRF is a hybrid landfill and recycling center. It has the same capacity as the default landfill, but will divert a portion of the incoming trash to an on-site recycling facility so that the landfill will take much longer to reach capacity. Once it reaches capacity, it will still process a small amount of garbage. It is significantly more expensive to build than the default landfill, but is slightly cheaper to operate since the recyclables offset some of the operating cost.
- Triangles/LOD Triangles – 5,280 / 100
- Category – Garbage (Landfill)
- Size – 13×12
- Electrical Use – 0 MW
- Construction Cost – $15,000
- Fire Hazard – 3
- Fire Tolerance – 20
- Garbage Accumulation – 0
- Maintenance Cost – $140/week
- Maintenance Cost – $14/truck/week
- Noise Accumulation – 100
- Noise Radius – 12.5 tiles
- Pollution Accumulation – 20
- Pollution Radius – 5 tiles
- Sewage Accumulation – 160 m^3/week
- Water Consumption – 192 m^3/week
- Workers U/E/W/H – 20/10/0/0
- Animal Count – 1
- Collection Radius – 100 tiles
- Power Output – 0 MW
- Garbage Capacity – 8,000,000 units
- Processing Rate – 16,000 units/week
- Garbage Trucks – 10 trucks
Many of the props used with this asset are from the default library of props. However, I am also using props from the Common Props and Trees Collection and it is recommended that you subscribe to all the props in this collection. If you don’t subscribe to this collection, it will still work, but there will be a few props/trees missing.
Check out the More Better Buildings Collection collection for more assets such as this.