Small biogas facility
As I modelled most of my sewage treatment facility after Mariagerfjord Rensningsanlæg in Denmark I had to include their little biogas building. Instead of just making it decorative I made it into an incinerator. This way it picks up trash (sludge) from the other buildings and turn it into energy. It’s way more efficient than the real thing, but I also felt like it should actually do something.
Ofc as CS’s garbage truck drivers aren’t very smart, these go all over the city instead of to the buildings right next to them (unless there’s no road ofc! ? ) even though their collection radius is very small. It can keep up with the garbage from the two buildings, two clarifiers and two sedimentation tanks, but eventually it will fill up and need to “burn” off it’s garbage.
Stats
Size: 6×3
Cost: 18000
Upkeep: 256/week
Noise pollution: 50
Ground pollution: 0
Electricity: 80 KW
Capacity: 40000
Garbage trucks: 3
Processing rate: 8000/week
Model
Tris: 1121
Texture: 1024
LOD
Tris: 172
Texture: 128
Update 17/1: Changed the stats a bit. I increased the cost, upkeep and electricity use. Let me know how it feels now balance wise. ?
[www.patreon.com][www.paypal.me]